K-12 Education
Winslow High School
The Winslow Unified School District Project involved the design and construction of a new replacement high school. This project was funded by the Arizona School Facilities Board, and bid with the ASFB’s original cost guidelines. Johnson Walzer Associates teamed up with BPLW Architects for this project. The design included a 2 story classroom building with a free standing auditorium, built with the existing campus. The design team assisted in materials for a bond election. The project was expanded, to include a science wing, choral room and student union.